All work

03 — Work · 04

CS Command Center

La Capsule · 2026 · Fictitious dataTraining project

Situation
Helping a Customer Success team see which new customers to support first, and why.
What I built
A no-code app: Bubble interface, Airtable data, four n8n workflows, Claude for one analysis step, human approval before any Slack escalation.
Measured result
14 scenarios tested and passed on the demo dataset (August 2026). Not deployed with a client; no business result measured.

How it works and safeguards

  1. WF01 · Handoff & customer onboarding

    Receives the Sales → Customer Success handoff, then creates or finds the account, contact, handoff and onboarding in Airtable, without creating a duplicate account.

  2. WF03 · Prioritisation

    Calculates a priority score from four weighted criteria, then a risk level: high, medium or low. A fixed, auditable rule, without AI.

  3. WF02 · CS Copilot

    On request, Claude summarises the context, flags missing information without inventing it, recommends a next action and can draft a message.

  4. WF12 · Escalation

    Prepares a summary, waits for a person’s decision, then sends the Slack escalation. A rejection cancels it; a second execution is refused. Every step is logged.

Limits

Demonstration prototype with fictitious data. Before real use, the workflows would need a persistent environment, secured entry points and richer handoff data.

Next stage of development

The functional foundation is in place. The next stage is to industrialise, secure and generalise what has already been demonstrated. Roadmap set out in the final project report (August 2026):

  1. 1. Richer handoffs

    Extend WF01 with the main contact’s role, customer goals and real handoff notes.

  2. 2. Versioned rules

    Formally version the completeness formula and the prioritisation rules.

  3. 3. Secured entry points

    Authenticate and secure the public entry points.

  4. 4. Persistent environment

    Deploy n8n on a persistent environment, replacing the local instance and temporary tunnel, with separate development, test and production.

  5. 5. Observability

    Add structured logs, alerts and correlation by run ID and idempotency key.

  6. 6. Regression tests

    Cover the nominal case, missing values, wrong types, duplicates and external errors.

Planned steps, not results yet.

What will be measured in real use

Indicators defined to steer the move to real volume. None is measured yet.

  1. Handoff → first action time

    Does the system shorten the time before customers can be actively supported?

  2. Complete handoff rate

    The quality of information available from the start of the journey.

  3. Missing information detected

    Do gaps become visible before they slow decisions down?

  4. Duplicates and re-runs blocked

    How robust the idempotency and uniqueness checks are.

  5. Preparation → human decision time

    How smooth approval is before a sensitive action.

  6. Approved / rejected actions

    How useful the recommendations really are, and the quality of human control.